IC windows: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
 (Created page with "There are right now 7 functional windows for the Dragon IC.  All of them have been tested and there is a record of the pressure both on the ionization chamber and the other side of the window for each.  NAME 	THICKNESS (micrometers) 	PRODUCT DATE 	TOP PRESSURE TESTED WINDOW A 	1,5 	13.07.2017 	19 WINDOW B 	1,5 	08.2018 	25 WINDOW C 	0,9 	08.07.2002 	14 WINDOW D 	0,9 	17.07.2019 (new) 	14 WINDOW E 	0,7 	18.07.2019 (new) 	11 WINDOW F 	0,5 (with wires) 	16.06.2015 	9 WINDOW...")  | 
				No edit summary  | 
				||
| (One intermediate revision by the same user not shown) | |||
| Line 1: | Line 1: | ||
There are right   | There are right presently 7 functional windows for the Dragon Ionization Chamber.  | ||
All of them have been tested and there is a record of the pressure both on the ionization chamber and the other side of the window for each.  | All of them have been tested and there is a record of the pressure both on the ionization chamber and the other side of the window for each.  | ||
A detailed spreadsheet of the pressure tests for each window can be found in the attachment of the following DRAGON hardware elog: https://elog.triumf.ca/Dragon/Hardware/490  | |||
{| class="wikitable"  | |||
!colspan="11"|EPICS task list  | |||
|-  | |||
|'''Name'''  | |||
|'''Thickness (um)'''  | |||
|'''Production date'''  | |||
|'''Top pressure tested (Torr)'''  | |||
|'''Status'''  | |||
|'''Action required'''  | |||
|'''Date of status update'''  | |||
|-  | |||
|WINDOW A  | |||
|1,5  | |||
|13.07.2017  | |||
|19  | |||
|ready for use  | |||
|None  | |||
|Nov-09-2023  | |||
|-  | |||
|WINDOW B  | |||
|1,5  | |||
|08.2018  | |||
|25  | |||
|ready for use  | |||
|None  | |||
|Nov-09-2023  | |||
|-  | |||
|WINDOW C  | |||
|0,9  | |||
|08.07.2002  | |||
|14  | |||
|ready for use  | |||
|None  | |||
|Nov-09-2023  | |||
|-  | |||
|WINDOW D  | |||
|0,9  | |||
|17.07.2019 (new)  | |||
|14  | |||
|installed (small leak)  | |||
|Retire (back-up only)  | |||
|Nov-09-2023  | |||
|-  | |||
|WINDOW E  | |||
|0,7  | |||
|18.07.2019 (new)  | |||
|11  | |||
|ready for use  | |||
|None  | |||
|Nov-09-2023  | |||
|-  | |||
|WINDOW F  | |||
|0,5 (with wires)   | |||
|16.06.2015  | |||
|9  | |||
|ready for use  | |||
|None  | |||
|Nov-09-2023  | |||
|-  | |||
|WINDOW G  | |||
|0,5  | |||
|19.07.2019 (new) 	  | |||
|6  | |||
|ready for use  | |||
|None  | |||
|Nov-09-2023  | |||
|}  | |||
The highest pressure is just an indicator, some of them could certainly hold higher values  | The highest pressure is just an indicator, some of them could certainly hold higher values  | ||
Latest revision as of 11:48, 9 November 2023
There are right presently 7 functional windows for the Dragon Ionization Chamber.
All of them have been tested and there is a record of the pressure both on the ionization chamber and the other side of the window for each. A detailed spreadsheet of the pressure tests for each window can be found in the attachment of the following DRAGON hardware elog: https://elog.triumf.ca/Dragon/Hardware/490
| EPICS task list | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Name | Thickness (um) | Production date | Top pressure tested (Torr) | Status | Action required | Date of status update | ||||
| WINDOW A | 1,5 | 13.07.2017 | 19 | ready for use | None | Nov-09-2023 | ||||
| WINDOW B | 1,5 | 08.2018 | 25 | ready for use | None | Nov-09-2023 | ||||
| WINDOW C | 0,9 | 08.07.2002 | 14 | ready for use | None | Nov-09-2023 | ||||
| WINDOW D | 0,9 | 17.07.2019 (new) | 14 | installed (small leak) | Retire (back-up only) | Nov-09-2023 | ||||
| WINDOW E | 0,7 | 18.07.2019 (new) | 11 | ready for use | None | Nov-09-2023 | ||||
| WINDOW F | 0,5 (with wires) | 16.06.2015 | 9 | ready for use | None | Nov-09-2023 | ||||
| WINDOW G | 0,5 | 19.07.2019 (new) | 6 | ready for use | None | Nov-09-2023 | ||||
The highest pressure is just an indicator, some of them could certainly hold higher values