Gas Target: Difference between revisions
Jump to navigation
Jump to search
Line 73: | Line 73: | ||
== Emergency procedures, response to pump trips == | == Emergency procedures, response to pump trips == | ||
=== Power outage === | |||
=== Loss of compressed air to valves === | |||
=== Pump trips === |
Revision as of 13:56, 25 June 2025
Version | Author | Description | Date |
---|---|---|---|
1.0 | D. Hutcheon | Initial Document | 27 September 2002 |
1.1 | D. Hutcheon | Hidden valves,shack | 4 April 2007 |
1.2 | D. Hutcheon | Leak checking | 27 April 2007 |
1.3 | D. Hutcheon | Decadal update | 22 January 2019 |
1.4 | A. Lennarz | Transferred to wiki | June 25th, 2025 |