IC windows
Jump to navigation
Jump to search
There are right presently 7 functional windows for the Dragon Ionization Chamber.
All of them have been tested and there is a record of the pressure both on the ionization chamber and the other side of the window for each.
EPICS task list | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
Name | Thickness (um) | Production date | Top pressure tested (Torr) | Status | Action required | Date of status update | ||||
WINDOW A | 1,5 | 13.07.2017 | 19 | ready for use | None | Nov-09-2023 | ||||
WINDOW B | 1,5 | 08.2018 | 25 | ready for use | None | Nov-09-2023 | ||||
WINDOW C | 0,9 | 08.07.2002 | 14 | ready for use | None | Nov-09-2023 | ||||
WINDOW D | 0,9 | 17.07.2019 (new) | 14 | installed (small leak) | Retire (back-up only) | Nov-09-2023 | ||||
WINDOW E | 0,7 | 18.07.2019 (new) | 11 | ready for use | None | Nov-09-2023 | ||||
WINDOW F | 0,5 (with wires) | 16.06.2015 | 9 | ready for use | None | Nov-09-2023 | ||||
WINDOW G | 0,5 | 19.07.2019 (new) | 6 | ready for use | None | Nov-09-2023 |
The highest pressure is just an indicator, some of them could certainly hold higher values