New pages
Jump to navigation
Jump to search
- 12:14, 27 June 2024 IC PID controller (hist | edit) [328 bytes] Lennarz (talk | contribs) (Created page with "File:DRAGON PID Settings.pdf")
- 11:35, 9 November 2023 IC windows (hist | edit) [1,236 bytes] Lennarz (talk | contribs) (Created page with "There are right now 7 functional windows for the Dragon IC. All of them have been tested and there is a record of the pressure both on the ionization chamber and the other side of the window for each. NAME THICKNESS (micrometers) PRODUCT DATE TOP PRESSURE TESTED WINDOW A 1,5 13.07.2017 19 WINDOW B 1,5 08.2018 25 WINDOW C 0,9 08.07.2002 14 WINDOW D 0,9 17.07.2019 (new) 14 WINDOW E 0,7 18.07.2019 (new) 11 WINDOW F 0,5 (with wires) 16.06.2015 9 WINDOW...")
- 12:42, 22 September 2023 High Voltage - ISEG power supply (hist | edit) [1,042 bytes] Lennarz (talk | contribs) (Created page with "As mentioned in the previous group meeting, the new MPOD crate has been installed. We have two new modules 1x 3kV and 1x 500V. Each are 16 channels. These can accommodate both polarities. Channels 0-7 are negative and 8-15 are positive. The controller module is CC24, which can interface with EPICS. These modules can be operated via the iseg software or the web interface. The host name for the control module is dragonhv02.triumf.ca and sits behind the TRIUMF firewal...")
- 16:09, 13 September 2023 BGO Calibration (hist | edit) [2,973 bytes] Akatrusiak (talk | contribs) (started bgo calibration page) Tag: Visual edit
- 17:10, 11 August 2023 GEANT3 (hist | edit) [58 bytes] Akatrusiak (talk | contribs) (Created page with "** RAYTRACE Documentation ** Media:Raytrace_Manual.pdf")