Oldest pages
Jump to navigation
Jump to search
Showing below up to 31 results in range #1 to #31.
- Hardware (12:46, 3 November 2021)
- Operations (13:46, 3 November 2021)
- DRAGON Facility Coordinator and Alternates (13:47, 3 November 2021)
- DAQ (13:49, 3 November 2021)
- DRAGON counting room and experimental area (13:50, 3 November 2021)
- Specifications (11:12, 14 January 2022)
- Parts to be purchased (09:34, 18 January 2022)
- MCP foils (09:50, 18 January 2022)
- Lock up DRAGON (09:56, 18 January 2022)
- Repair/Fault task list (14:45, 18 January 2022)
- TRIUMF collaborators (14:48, 18 January 2022)
- ED conditioning (17:24, 24 March 2022)
- Technical Drawings (15:08, 10 August 2023)
- GEANT3 (17:14, 11 August 2023)
- BGO Calibration (16:09, 13 September 2023)
- High Voltage - ISEG power supply (12:56, 22 September 2023)
- User's manual for DRAGON separator Hardware (11:31, 9 November 2023)
- EPICS (11:37, 9 November 2023)
- IC windows (11:48, 9 November 2023)
- Computing (12:43, 9 November 2023)
- IC PID controller (12:18, 27 June 2024)
- Safety reports (11:08, 25 June 2025)
- End Detectors (11:22, 25 June 2025)
- ChangeTargetGas (12:55, 25 June 2025)
- Hybrid Detector (09:40, 26 June 2025)
- Gas Target (13:53, 30 June 2025)
- Checking Transmission, Alignment, and Beam Energy (15:51, 2 July 2025)
- Signing up for the DRAGON MIDAS Alarm notifications (09:55, 9 July 2025)
- Tune the DRAGON separator (16:20, 10 July 2025)
- Main Page (06:21, 17 July 2025)
- What to monitor on a DRAGON shift (15:09, 17 July 2025)