Oldest pages
Jump to navigation
Jump to search
Showing below up to 31 results in range #1 to #31.
- Hardware (13:46, 3 November 2021)
- Operations (14:46, 3 November 2021)
- DRAGON Facility Coordinator and Alternates (14:47, 3 November 2021)
- DAQ (14:49, 3 November 2021)
- DRAGON counting room and experimental area (14:50, 3 November 2021)
- Specifications (12:12, 14 January 2022)
- Parts to be purchased (10:34, 18 January 2022)
- MCP foils (10:50, 18 January 2022)
- Lock up DRAGON (10:56, 18 January 2022)
- Repair/Fault task list (15:45, 18 January 2022)
- TRIUMF collaborators (15:48, 18 January 2022)
- ED conditioning (18:24, 24 March 2022)
- Technical Drawings (16:08, 10 August 2023)
- GEANT3 (18:14, 11 August 2023)
- BGO Calibration (17:09, 13 September 2023)
- High Voltage - ISEG power supply (13:56, 22 September 2023)
- User's manual for DRAGON separator Hardware (12:31, 9 November 2023)
- EPICS (12:37, 9 November 2023)
- IC windows (12:48, 9 November 2023)
- Computing (13:43, 9 November 2023)
- IC PID controller (13:18, 27 June 2024)
- Safety reports (12:08, 25 June 2025)
- End Detectors (12:22, 25 June 2025)
- ChangeTargetGas (13:55, 25 June 2025)
- Hybrid Detector (10:40, 26 June 2025)
- Gas Target (14:53, 30 June 2025)
- Checking Transmission, Alignment, and Beam Energy (16:51, 2 July 2025)
- Signing up for the DRAGON MIDAS Alarm notifications (10:55, 9 July 2025)
- Tune the DRAGON separator (17:20, 10 July 2025)
- Main Page (07:21, 17 July 2025)
- What to monitor on a DRAGON shift (16:09, 17 July 2025)